How PREFAB HOMES Could Solve the Housing Shortage with Speed

Volumod built a 36 unit apartment building in Indy with 80 modular units. Offsite construction can save time in the overall built process by having structures built offsite at the same time foundation work is being done on site. In this video I stop by the project underway from Volumod to see what it looks life for a modular unit to be delivered and craned into place. This was a unique opportunity for me to showcase a piece of the process that I rarely get to see.

Check out Volumod: https://www.volumod.com
Subscribe for more!
Add me on instagram: https://www.instagram.com/kerrytarnow/?hl=en

_______________________________________
Shop my Amazon Store for items I’m using, wearing and like:
https://www.amazon.com/shop/kerrytarnow

What I’m Wearing:
https://amzn.to/3IE6lwQ

Get In my Kitchen:
https://amzn.to/43iobz3

What I’m using to make Videos:
https://amzn.to/3MnJU0k

*all content on this YouTube channel reflects my own person opinion and should not be taken as legal advice or investment advice. Please seek out the guidance of trained and licensed individuals before making any decisions. Some of the links that appear on this video are from companies which Kerry Tarnow will earn an affiliate commission.

Similar Posts

  • PDC House

    The design strategy of this house is based on a commitment to artisanal constructive honesty, the respect towards natural context in an urban area, and the constant search for a way of inhabiting where material austerity provides spatial quality. The main body of the house is located in the southern boundary of the land, respecting the 3 preexisting fruit trees on the north side and taking advantage of the best ventilation and natural light possible. The program, which includes 2 bedrooms, social area, a family room and services, is condensed in a monolithic block to reduce its footprint. As a main strategy, the upper roof tilts 21 degrees, prioritizing the northern bedroom spaces and reducing the southern service spaces. The subtraction and rotation of a middle segment generates a shift in between the upper floor bedrooms, allowing cross ventilation, as well as the accommodation of rooftop equipment and the plumbing and electrical ducting. In section, the composition allows the circulation of north-south winds, cooling the kitchen by the hot air escape achieved through height differences. The constructive solution contemplates material honesty in all the elements. The concrete walls on ground floor, pured with recycled formwork, give an imperfect finish consistent with the roof’s austerity, but contrasted with the cleanliness and volumetric continuity of the upper floor finish. To reduce economic impact, ceiling and floor finishings and tilings were completely eliminated using bare concrete floors and, in order to express the constructive and structural performance, the roofs use a system of bare concrete joists in combination with vaulted pieces, designed and manufactured using a mold made with local artisan blacksmithing.